NERDC Scheme of Work · SS 2
Solar Photovoltaic Installation Scheme of Work for SS 2
The full NERDC-aligned solar photovoltaic installation scheme of work for SS 2, broken down by term and week. Use it to plan your year, write lesson notes, or generate ready-to-teach slides with LearnStack.
- Class level
- SS 2
- Subject code
- TRD-SPV
- Terms
- 3
- Weeks documented
- –
Scheme being prepared
We’re finalising the Solar Photovoltaic Installation scheme of work for SS 2.
Our editorial team is matching the official NERDC topic graph against the 2024/2025 SSEC revision. In the meantime, LearnStack already generates solar photovoltaic installation lesson notes and slides for SS 2on demand. The underlying topic list is loaded directly from the NERDC PDF for your school’s account.
- Three terms, ~12 weeks each, following the FME 2020 scheme of work.
- Objectives, expected outcomes, and recommended activities per week.
- Mapped to WAEC, NECO, and JAMB syllabi where applicable.
Turn this scheme into a Solar Photovoltaic Installation lesson note in 60 seconds
Pick a week, click generate, and LearnStack writes a full NERDC-format lesson note for your SS 2 class: objectives, instructional materials, presentation steps, evaluation, and assignment included.